Sorry, you need to enable JavaScript to visit this website.

Take note of road closure on Adams for I-14 study meeting

Road construction will be occurring on Adams Avenue from E. 1 st St./Hwy 190/77 to 6 th St.
during the I-14 Central Texas Corridor Public Meeting on Thursday, Nov. 2, at the Yards of
Cameron. Adams Avenue will be closed to through traffic.
Those who are planning to attend the public meeting can access the Yards of Cameron via E 3 rd St as
shown on the map below.

Road closed signs will be placed at:

  • E. 1st St./Hwy 190/77 at Adams Ave.
  • 3rd St. at Adams Ave. (traffic will be allowed to access the Yards of Cameron the day of the public meeting)
  • 6th St. at Adams Ave.

 

The Texas Department of Transportation (TxDOT) Bryan District is studying the future I-14 Central Texas Corridor from Rogers in Bell County to Huntsville in Walker County. This Study will determine the feasibility of a corridor and route for a roadway that meets interstate standards. Additionally, the Study will include an evaluation of the more recently designated future Loop I-214 around Bryan-College Station, which is anticipated to co-align with I-14 as it passes near the Bryan-College Station area.

TxDOT is hosting a series of open house public meetings to introduce the Study, share background information, and gather feedback from local communities throughout the Study area. This is the first round of public meetings for this Study. The same information will be shared at each meeting and made available online.

Attendees will be able to come and go as they please to review Study materials, ask questions, and share comments in an open-house format. Online participants will be able to view the same information provided at the in-person meetings.

The Cameron Herald

The Cameron Herald
P.O. Box 1230
Cameron, Texas 76520

Phone: 254-697-6671